MAWFC DOME external works completed
2021 September: MAWFC DOME works completed. Network, switches, UPS and building alarm were all set.
This author has yet to write their bio.Meanwhile lets just say that we are proud ptb contributed a whooping 3 entries.
2021 September: MAWFC DOME works completed. Network, switches, UPS and building alarm were all set.
2019 November 01: MAWFC DOME (ROLL-OFF) completed in Kryoneri Observatory (IAASARS/NOA).
2015 June 16: First light on sky tests have been performed in Kryoneri Observatory (IAASARS/NOA).