MAWFC DOME external works completed

2021 September:

MAWFC DOME works completed. Network, switches, UPS and building alarm were all set.

MAWFC DOME (ROLL-OFF) completed in Kryoneri Observatory (IAASARS/NOA)

2019 November 01:
MAWFC DOME (ROLL-OFF) completed in Kryoneri Observatory (IAASARS/NOA). Read more

First light on sky tests have been performed in Penteli hill (IAASARS/NOA head-quarters).

2015 April 01:
First light on sky tests have been performed in Penteli hill (IAASARS/NOA head-quarters). Read more

MAWFC in the optical lab of IAASARS – Optical tests/alignments.

2015 March 20-31:
MAWFC in the optical lab of IAASARS – Optical tests/alignments. Read more

MAWFC completed in the mechanical lab (MYEDPP) – Final Acceptance tests performed successfully.

2015 March 20:
MAWFC completed in the mechanical lab (MYEDPP) – Final Acceptance tests performed successfully. Read more

MAWFC constructed in the mechanical lab (MYEDPP)- First Acceptance tests performed successfully.

2015 March 02:
MAWFC constructed in the mechanical lab (MYEDPP)- First Acceptance tests performed successfully. Read more

Mechanical construction of MAWFC in the mechanical laboratory/University of Patras (MYEDPP).

2015 February:

Mechanical construction of MAWFC in the mechanical laboratory/University of Patras (MYEDPP). Read more

Mechanical design of MAWFC at JBCA/University of Manchester, UK

2014 October – 2015 January:

Mechanical design of MAWFC at JBCA/University of Manchester, UK. Read more